| First | Previous | Back to Index | Next | Last | |||||
| 149 records found. Page 13 of 15 displayed. | |||||||||
For most of the photos on this page, you can click the image for a larger picture.
![]() |
April 2023 And after cleaning the dust off on the other side of the line.... |
![]() |
May 2023 This applicator does the trick although you have to shake hard with the longer grass. I apply a PVA/water mix to about a foot square at a time. The stone wall came from Ten Commandments. |
![]() |
May 2023 As this is a meadow, I have been more even with the colouring. I need to get some sheep in here. The barn is from Scale Model Scenery, another nice kit to put together. |
![]() |
May 2023 For this year, I have bitten the bullet and started to tackle semaphore signal building. A breakthrough came with the bottle of flux that you can see in the background. A good dollop of this on the brass and soldering suddenly becomes a lot simpler - you still could do with 2 pairs of hands. Steve from RMWeb recommends a brass tube for the base but I couldn't get the smaller tubes to solder inside the brass tube without one of the others dropping off. So the round base is turned from solid brass. I managed to salvage 3 finials from the Alan Gibson kits and managed to turn a fourth one on the lathe. The bits and pieces came from Model Signal Engineering. You can see a couple of frets in the photo. I need 4 starter/distant semaphores. They will need to be electrically slotted as each arm is operated from a different box. |
![]() |
June 2023 I also need a gantry for the station throat arrivals. As the up (departure line) is used for shunting, I'm going to need 4 dolls. The Pratt Truss gantry kit comes from Alan Gibson Workshop. The holes for the dolls are a bit big so I turned some bases from brass rod. |
![]() |
June 2023 The first doll in position |
![]() |
This is where the gantry will be located |
![]() |
June 2023 Now we get to the hard part. It has to work for its living. The right hand arm has had the operating wire fitted. |
![]() |
June 2023 I've fitted 3 of the 4 bell cranks for the initial run. On the left hand arm, only one bell crank is required (although I did solder 2 together). As we move away from the left hand doll, I need 2 bell cranks so that the horizontal run is displaced from other horizontal runs - if that makes sense! |
![]() |
July 2013 A quick diversion as we have a busy day at the junction. I need to get some street lamps on the road. |
| First | Previous | Back to Index | Next | Last | |||||
| 149 records found. Page 13 of 15 displayed. | |||||||||











